Manhattan Maple Assembly Pics Standard 15" Base |
|
ID parts before starting |
|
Face frame goes face down on soft surface (to protect from scratches) | |
Side panels snap into face frame |
|
insert locking screw into all metal "L" brackets after they have been snapped into place. |
|
slide floor panel into side panel grooves
|
|
snap in and lock back panel
set shelf clips and shelf |
|
drawer box requires assembly. screwed rabbit joints with captured "floating" 1/2" plywood floor
|
|
insert and screw in the drawer guide back brackets (pre drilled holes in back panel) |
|
slide drawer guide into back bracket |
|
use beveled head screws to attach front of drawer guide to face frame (see pre drilled holes) |
|
note how drawer box attaches to drawer guides steel hook on drawer guide go into the predrilled hole on the back side of the drawer box |
|
steel pin on forward drawer guide snaps into predrilled hole on bottom edge of drawer box side |
|
screw on counter top brackets |
|
attach quiet pads |
|
Doors are pre hung on face frames - Manhattan drawer box shipped unassembled - base cabinets should take about 15 minutes to assemble, wall cabinets go a little quicker. |
Questions? call GRANGER DAVIS 386-761-4946 |
Offices in Daytona Beach, FL 386-761-4946 fax 888-761-8050
Office Hours Monday thru Friday 9:00am to 4:00pm EST